Notice: The ability to post new subcontracting opportunities is not currently available.
Small businesses can browse the listing below to find subcontracting opportunities. You can filter the listing by state or keyword, or sort the listing by clicking a column header. Please direct questions to the posted point of contact for the opportunity, not SBA. Any posts meant only to promote your small business will be removed.
Need help? Contact subcontracting@sba.gov.
| Description | Closing date | Performance start date | Place of performance | NAICS code | Point of contact |
|---|---|---|---|---|---|
| Bldg #7 Install Fire-rated Door Assembly Tongue Point Job Corps Install a 10’-0” fire-rated door assembly to include 1-hour fire-rated wall construction, 3’-6”x7’0” door (with label), steel frame (with label), closers, latching mechanisms and panic hardware. |
2/27/2026 | 3/16/2026 | Oregon | 238290: Other Building Equipment Contractors | |
| C0718 – East Pipeline Inspection and Rehabilitation Project Ranger Pipelines Incorporated Completion of thirteen (13) milestones as defined in Notice to Bidders (NTB). |
3/11/2026 | 4/1/2026 | California | 238990: All Other Specialty Trade Contractors | |
| 230030.16 LSLR PKG 23 Spiniello Companies Looking for SBE/DBE/MWBEs for DC Water DCW-SOL-26-10513/230030.16 LSLR Contract: Please send quote to estimating@spinielloco.com for additional NAICS codes (but not limited to) 237310, 561190, 238910, 237990. |
2/25/2026 | 5/25/2026 | District of Columbia | 237110: Water and Sewer Line and Related Structures Construction | |
| PWG126-ADMIN-6299 Grove Basin Storm Drain / County of San Bernardino WEKA INC The scope of work includes the installation of 72-inch, 84-inch, and 96-inch reinforced concrete pipe, construction of junction structures and manhole facilities, trench reconstruction and overlay, and the implementation and maintenance of temporary traffic control measures along Grove Avenue. |
3/19/2026 | California | 237110: Water and Sewer Line and Related Structures Construction | ||
| Redlands WWTP Upgrades-Phase 2 Filanc Upgrades to the Headworks, Primary Clarifiers and Primary Sludge Pump Station, Peak Ponds and Pump Station, Effluent Pump Station, Thickening System, Digestion System, Supernatant Ponds, MBR and Aeration Basins, Site Civil, Plant-Wide E&IC, and SCADA. Engineer’s estimate: $40,000,000. |
3/19/2026 | 6/1/2026 | California | 237110: Water and Sewer Line and Related Structures Construction | |
| Install Emergency Shut-Off Switches Tongue Point Job Corps Install 3 emergency shut-off switches and support for 2 3-phase panels and 5 1-phase panels |
2/27/2026 | 3/16/2026 | Oregon | 238210: Electrical Contractors and Other Wiring Installation Contractors | |
| Electrical Ground at Disconnect for three (3) buildings Tongue Point Job Corps Establish an effective path for ground-fault current to return to the source for three buildings. |
2/27/2026 | 3/9/2026 | Oregon | 238210: Electrical Contractors and Other Wiring Installation Contractors | |
| Madden Creek Water System Improvement Project, Phase 4 Vinciguerra Construction, Inc. Madden Creek Water System Improvement Project, Phase 4. |
3/16/2026 | California | 237110: Water and Sewer Line and Related Structures Construction | ||
| Medford RWRF- EWP2 - SC4 & Storm Water Slayden Constructors, Inc Slayden Constructors Inc. is requesting subcontractor bids for the following scopes of work: Coatings, Sawing, Concrete Finishing, Concrete Pumping, Dewatering, Electrical, Fencing, Pond Liner, Mechanical Insulation, Paving, Rebar, Seeding, Shoring, Survey, Traffic Control, and Trucking |
3/12/2026 | 5/1/2026 | Oregon | 237110: Water and Sewer Line and Related Structures Construction | |
| Madden Creek Water System Improvement Project Phase 4 RaPiD Construction Inc. Madden Creek Water System Improvement Project Phase 4. |
3/16/2026 | California | 237110: Water and Sewer Line and Related Structures Construction |