CITY OF LOS ANGELES DEPARTMENT OF WATER & POWER Western Trunk Line – Phase 2A (IFB No. 8070)
Description
Western Trunk Line - Phase 2A / IFB No. 8070
Installation of Welded Steel Pipe & Kubota Earthquake Resistant Ductile Iron Pipe by means of Open Cut. Installation of 11,877 feet of 36-inch trunk line by open trench (WSP, ERDIP-US,ERDIP-Kubota). Installation of 10,086 feet of mainline (4- through 16-inch pipe, WSP, DI, ERDIP-US, ERDIP-Kubota)
NAICS:
212319, 212321, 237110, 237310, 238110, 238120, 238130, 238190, 238210, 238320, 238350, 238390, 238910, 238990, 332999, 423830, 423990, 484220, 488490, 532412, 541330, 541370, 541380, 541620, 541990, 561730, 562112, 562910
Type of Businesses Being Solicited
- Small Business (SB)
- Small Disadvantaged Business (SDB)
- Disadvantaged Business Enterprise (DBE) – Dept of Transportation
- Minority Business Enterprise (MBE) – NMSDC certification (non-federal)
- Woman Business Enterprise (WBE) – WBENC certification (non-federal)
NAICS code
- 237310: Highway, Street, and Bridge Construction