Sewer Collection System Pipeline Rehabilitation and Replacement Project Phase 10, CA
Description
PHASE 10: The project work is generally described as: the replacement of 13,016 linear feet of 6 and 8-inch vitrified clay pipe (VCP) with 8-inch high density polyethylene pipe (HDPE); 1,733 linear feet of 8-inch VCP with 10-inch HDPE pipe; 279 linear feet of 12-inch VCP with 12-inch HDPE pipe; 414 linear feet of 15-inch VCP with 18-inch HDPE pipe and the reconnection of all laterals and re-channelization of all manholes, as shown on the plans and specifications.
Type of Businesses Being Solicited
- Disadvantaged Business Enterprise (DBE) – Dept of Transportation
- Minority Business Enterprise (MBE) – NMSDC certification (non-federal)
- Woman Business Enterprise (WBE) – WBENC certification (non-federal)
NAICS code
- 237110: Water and Sewer Line and Related Structures Construction