SOL-ASO-0953-00
Description
i) New DME foundation
ii) Install DME fiberglass Shelter.
iii) New power rack foundation.
iv) The power to GS/AWOS site trench 200 LF DEB.
v) Install new Power Panel (120/240 volts, 1 phase, 3 wire, 100 amps main lug interior).
NAICS code
- 238210: Electrical Contractors and Other Wiring Installation Contractors