Notice: The ability to post new subcontracting opportunities is not currently available.
Small businesses can browse the listing below to find subcontracting opportunities. You can filter the listing by state or keyword, or sort the listing by clicking a column header. Please direct questions to the posted point of contact for the opportunity, not SBA. Any posts meant only to promote your small business will be removed.
Need help? Contact subcontracting@sba.gov.
| Description | Closing date | Performance start date | Place of performance | NAICS code | Point of contact |
|---|---|---|---|---|---|
| RFQ5098 Bldg. 40 Audio System Installation San Diego Job Corps Center THIS IS A SUBCONTRACTING OPPORTUNITY with Management & Training Corporation (MTC), for the San Diego Job Corps Center. The center is located at 1325 Iris Ave, Imperial Beach, CA 91932. |
5/8/2026 | 5/18/2026 | California | 238210: Electrical Contractors and Other Wiring Installation Contractors | |
| Sewer Collection System Pipeline Rehabilitation and Replacement Project Phase 10, CA California Trenchless, Inc. PHASE 10: The project work is generally described as: the replacement of 13,016 linear feet of 6 and 8-inch vitrified clay pipe (VCP) with 8-inch high density polyethylene pipe (HDPE); 1,733 linear feet of 8-inch VCP with 10-inch HDPE pipe; 279 linear feet of 12-inch VCP with 12-inch HDPE pipe; 4 |
5/14/2026 | 7/6/2026 | California | 237110: Water and Sewer Line and Related Structures Construction | |
| ILLINOIS STATE POLICE – CONSTRUCT NEW CRIME LAB River City Construction, LLC ILLINOIS STATE POLICE – CONSTRUCT NEW CRIME LAB BID OPENING BID DATE OF 5/19/2026 @ 11:00 AM. |
5/19/2026 | Illinois | 236220: Commercial and Institutional Building Construction | ||
| Coachella Valley Water District: Valley View Water Consolidation Project (Spec No. 2025-14) WEKA Inc. The project consists of installing approximately 800 linear feet of 32-inch diameter fusible high density polyethylene (HDPE), 2,070 linear feet of 30-inch, 5,410 linear feet of 24-inch, 3,330 linear feet of 12-inch, 2,180 linear feet of 8-inch diameter water main pipe with restrained joints, inc |
6/4/2026 | 8/3/2026 | California | 237110: Water and Sewer Line and Related Structures Construction | |
| SEWER COLLECTION SYSTEM PIPELINE REHABILITATION AND REPLACEMENT PROJECT PHASE 10 Cratus Inc. SEWER COLLECTION SYSTEM PIPELINE REHABILITATION AND REPLACEMENT PROJECT PHASE 10. |
5/14/2026 | California | 237110: Water and Sewer Line and Related Structures Construction | ||
| AMI Meter Replacement Project Big Ben Engineering AMI Meter Replacement Project. |
5/12/2026 | California | 237110: Water and Sewer Line and Related Structures Construction | ||
| Canyon Lake Plant WO C2001 Shimmick Construction Company, Inc. Canyon Lake Water Treatment Plant (CLWTP) Improvements Fixed Price Design-Build Project Delivery (WO C2001). |
6/24/2026 | 11/2/2026 | California | 237110: Water and Sewer Line and Related Structures Construction | |
| 2026 Water Meter Installation Project Vinciguerra Construction, Inc 2026 Water Meter Installation Project. |
5/8/2026 | California | 237110: Water and Sewer Line and Related Structures Construction | ||
| Roadway Construction at Kelbaker, Kelso-Cima, Cima and Morning Star Mine Roads [CA NP MOJA 11(2) 10(2)] Las Vegas Paving Corporation Las Vegas Paving Corporation is inviting bids from ALL TRADES including, but not limited to the following: Permanent signing, pavement markings, and other miscellaneous work associated with road reconstruction and rehabilitation. |
5/14/2026 | 6/22/2026 | California | 237310: Highway, Street, and Bridge Construction | |
| SCADA Integration Services Inland Empire Utilities Agency The Inland Empire Utilities Agency ("IEUA" or “Agency”) is accepting electronic Statements of Qualifications (SOQ) via PlanetBids for System Integration Services to support the Agency’s continued effort to update its Supervisory Control and Data Acquisition (SCADA) system. |
5/12/2026 | Not applicable | 541511: Custom Computer Programming Services |